What is the best material for the purification plate?

Publisher: SOC (Jiangsu) Environmental Technology Co.,Ltd. | Hits: 286 | Published on: 2022-8-18 18:34:44 | Close

1. The walls and top plates of purification projects are generally made of 50mm thick sandwich color steel plates, which are characterized by beautiful appearance and strong rigidity. Arc corners, doors, window frames, etc. are generally made of special alumina profiles.

2. The floor of the purification project can be made of epoxy artesian floor or advanced wear-resistant plastic floor. If there is an anti-static requirement, an anti-static type can be selected.

3. The supply and return air ducts are made of hot-dip galvanized sheet, and the flame-retardant PF foamed plastic sheet with good purification and thermal insulation effect is attached.

4. The stainless steel frame is used for the high-efficiency air supply outlet, which is beautiful and clean. The perforated mesh plate is made of lacquered aluminum plate, which is not rusted and dust-free, and should be cleaned.

5. Reducing the content of suspended particles in the purified ambient air and effectively removing the existing solid particles are always the main contents of the production process control. When planning the construction of purification projects, how to achieve greater benefits and complete maximum output with the smallest investment has always been a very important issue for purification engineering designers. An efficient and economical design scheme is the only choice to achieve good benefits. The optimization and re-optimization of the design scheme is more for the control of the cost accounting of the clean project. How to effectively control the cost of the clean project has always been a troublesome thing for the clean engineers. Purification engineering - is very important in the design process of purification engineering; the level of cleanliness of purification engineering, materials used in purification engineering, air conditioning system, clean room enclosure structure, and floor engineering are the factors that affect the cost of purification engineering, clean room cost, and purification engineering cost. The main factors--purification project cost, clean workshop price, clean room quotation--several factors that affect the clean workshop purification project cost:


   First, pay attention to the source and strengthen the control of purification engineering design links
     1. The planning of the project must first strengthen the quality of the design drawings of the design unit.
amount of external monitoring and review. Give full play to the functional role of the clean room drawing review center, review and supervise the design quantity just like the engineering quality supervision station supervises the construction quality. The quality of clean engineering drawings is related to the quality of the clean project's construction cost control and so on.
    2. The method of standardizing the design budget for clean engineering, the establishment of the design budget must be comprehensively reviewed by the project standard fixed cost management station and the Construction Bank, etc., and the determined investment limit is used as the fee base, which can eliminate the artificial expansion of the design scale and the cost of arbitrarily calculated.
    3. Formulate a design reward and punishment system. If the design drawings are confirmed as excellent designs by the review center, special honors shall be given to the design unit, and rewards shall be given to the designers.

    4. Formulate the "limit design" standard. Limit design is an effective control method in the process of project construction, and it is also one of the effective measures to control the scale of investment. Therefore, it is an important task in design management to organize relevant departments as soon as possible to formulate appropriate quota design standards according to different types, scales and cleanliness requirements of buildings.

    5. Promote the application of "Four New" achievements in engineering design. With new technologies, new materials, new processes and new equipment, optimize the technical and economic indicators of purification engineering design, improve the scientific and technological content of the industry, and improve the overall benefits of the project.

    Second, grasp the key points and strengthen the control of project construction. Before the project starts, implementing project management is an effective way to improve labor productivity and economic benefits; and strengthening project cost management and reducing purification project costs are the top priorities of project management. Heavy, it is the lifeline of an enterprise, just like the quality of purification projects.

    It is an effective method to use the currency form to comprehensively manage the consumption of the management object during the project construction process. It is an effective method to use the standard cost to manage the project cost.
    1. Establishing a project cost responsibility system and implementing project management is a construction management method that implements the project manager responsibility system. Project cost management should be under the auspices of the project manager, assign the responsibility of various content of cost management to the person, conduct accounting and analysis separately, and establish a cost accounting responsibility system; improve the original cost record, strictly implement the scope of cost expenditure, and use various methods of cost management. , to conduct dynamic analysis of construction activities in a timely manner, and tap cost potential from each link and position.

    2. Adopt the cost difference assessment method. The difference between the actual cost and the standard cost or the budgeted cost is called the cost difference. During the construction of the project, due to various reasons, the actual cost incurred does not match the budgeted cost and the standard cost formulated by the enterprise, resulting in unfavorable and favorable differences. Through the assessment, the "difference" can be found in time, and the information can be fed back. The cost difference is divided accordingly.

    3. The method of standardizing the design budget for clean engineering, the establishment of the design budget must be comprehensively reviewed by the project standard fixed cost management station and the Construction Bank, etc., and the determined investment limit is used as the fee base, which can eliminate the artificial expansion of the design scale and the cost of arbitrarily calculated.