The construction process of the purification project |
Publisher: SOC (Jiangsu) Environmental Technology Co.,Ltd. | Hits: 239 | Published on: 2022-8-18 18:37:14 | Close |
Purification engineering is widely used in food, biological, electronic workshops and other places with purification needs to ensure the environmental quality of the workshop; the construction process of purification engineering is to communicate in the early stage, see the site, and make preliminary design plans according to actual needs. After confirmation, the contract is signed and the construction is carried out, and the final commissioning, acceptance and maintenance are carried out. There are some precautions in cleaning engineering that need to be paid attention to.
The construction process of the purification project
1. Communicate and see the scene Before a project is carried out, it is necessary to fully communicate with the owner and conduct on-site inspections, and to know what the other party wants, in order to determine and reasonably issue a plan. 2. Design The purification engineering company made a preliminary design plan based on the previous communication and on-site inspection, and adjusted it according to the actual needs of the owner. 3. Program exchange The formation of a plan often takes many exchanges to determine the final plan. 4. Sign the contract This is a business negotiation process. Before the construction of the project, there must be a contract, and the rights and interests of both parties can be ensured by acting in accordance with the contract. This contract must specify the purification construction process and the project cost and other information. 5. Design and construction drawings After the contract is signed, the construction drawing is produced. This step is very important, because the subsequent purification project is carried out in strict accordance with this drawing. 6. Construction At this stage, the construction must be carried out in strict accordance with the construction drawings. 7. Debugging and testing After the completion of the project, it is necessary to carry out debugging according to the requirements of the contract and the acceptance specifications, and at the same time, check whether the various processes meet the standards. 8. Acceptance If the test is correct, the next step is acceptance, and it can be put into formal use after the acceptance is completed. www.jssoc.cn |
Previous: What is the best material for the purification plate?
Next: No more