Sitemap  -  Collection  -  中文版  -  ENGLISH

Hello, welcome to SOC (Jiangsu) Environmental Technology Co.,Ltd. website!

Drive product innovation with design

Committed to building a leading benchmark in the industry

Hotline: +86 153-7183-3337

Your location: Home>>News>>Industry news
Requirements for clean room decoration

Publisher: SOC (Jiangsu) Environmental Technology Co.,Ltd. | Hits: 270 | Published on: 2022-8-18 17:58:59 | Close

Nowadays, the demand for dust-free workshops is increasing, and the requirements for dust-free workshops are also getting higher and higher. In the process of dust-free workshop decoration, it is necessary to ensure the construction quality and cleanliness. Below, Yantai Hongtao Decoration will share with you the requirements for the decoration of Yantai dust-free workshop.
   In the process of dust-free workshop decoration, it is necessary to ensure the construction environment. Generally, it is necessary to clean while construction, and the cleaning needs to be thorough without leaving dead ends. Especially for hidden projects, do a good job of cleaning, such as ceilings and clip walls, and make records after cleaning. , to avoid uncleaned places, clean air needs to be continuously transported to the workshop, and high-efficiency filters need to be installed in the workshop. Dust-related operations are prohibited in the installed workshop, causing filter blockage. The decorated workshop needs to be well protected The surface of the panel shall not be impacted, stepped on, knocked, or subjected to excessive water operations during the decoration. Doing so can cause panel dents, dark cracks and panel contamination. The dust-free workshop needs to pay attention to the tightness. When the sealant is embedded, the impurities and dirty oil in the base groove should be removed and kept dry.

   The floor of the dust-free workshop generally uses plastic sheets and coil surfaces, which should be classified according to specifications, sizes, and thicknesses during storage. There is air. The lighting system and ventilation need to be paid attention to at the decoration site of the clean room in Yantai. If the clean room is to be renovated, the power supply and toxic and harmful gases need to be identified and cut off before the construction can be carried out. During the decoration of the dust-free workshop, the decoration materials can temporarily enter and exit, and can be closed when not in use to prevent dust from entering the workshop.

  In the decoration of the clean room, it is necessary to ensure firmness. All components need to be connected to the main structure. Different materials are connected in different ways. Sealed with elastic material. Piping and wiring should be notched with appropriate width and depth. Pipeline and line pressure test to ensure no leakage during sealing. The floor of the dust-free workshop needs to be well-prepared for a waterproof layer and a moisture-proof layer. The gap in the dust-free workshop can be sealed with positive pressure. The skirting board can be flush with the wall or indented by 2-3MM during construction.

Previous: Main points of professional purification workshop

Next: Maintenance method of purification workbench

More

New Arrivals